In Korea, 22.9kV hybrid SFCL (Superconducting Fault Current Limiter) has been developed and carried out long-term field tests in Gochagn power test center of KEPCO through DAPAS program. The SFCL will be installed at a distribution line of Icheon substation in Korea. For the successful application, we have to design the specifications considering real power system operation. This paper proposes a concept of the operating current based rms value for the protection coordination with protective delays and studies a proper range of the current in Korean distribution power system.