In this study we investigate the background of UPS output transformer(△-Y) operation on neutral ungrounded system, and perform field experiment of neutral floating-phenomenon for the inter-locked securing of electric facilities and improvement of neutral floating-phenomenon. Experiment results show that a floating-phenomenon occurs when four-pole input-breaker trip and the neutral to earth voltage occurring concurrently is identified as phantom voltage. And the measures for the transient overvoltage that can occur in floating-state also are investigated. As a result, the risk elements of neutral ungrounded method as well as neutral floating-phenomenon are removed by installation of separate solidly-grounded transformer and switching four-pole input-breaker to three-pole input breaker.