1 |
Park, I., Kim, H., Lee, H., Kim, D., Min, Y. and Cho, H., 2021, Analysis of Causes and Impact of Change Orders in the U.S. Military Construction Projects, Journal of the Korea Institute of Building Construction, 21(3), pp.213-219. |
미소장 |
2 |
Sacks, R. and Goldin, M., 2007, Lean Management Model for Construction of High-Rise Apartment Buildings, Journal of Construction Engineering and Management, 133, pp.374-384. |
미소장 |
3 |
Atkinson, A.R., 2002, The Pathology of Building Defects; A Human Error Approach, Engineering, Construction and Architectural Management, 9(1), pp.53-61. |
미소장 |
4 |
Minato, T., 2003, Representing Causal Mechanism of Defective Designs: A System Approach Considering Human Errors, Construction Management and Economics, 21(3), pp.297-305. |
미소장 |
5 |
Chong, W.K. and Low, S.P., 2005, Assessment of Defects at Construction and Occupancy Stages, Journal of Performance of Constructed Facilities, 19(4), pp.283-289. |
미소장 |
6 |
Lee, S., Cha, Y., Han, S. and Hyun, C., 2019, Application of Association Rule Mining and Social Network Analysis for Understanding Causality of Construction Defects, Sustainability, 11, 618. |
미소장 |
7 |
Forcada, N., Macarulla, M., Gangolells, M., Casals, M., Fuertes, A. and Roca, X., 2013, Posthandover Housing Defects: Sources and Origins, Journal of Performance of Constructed Facilities, 27(6) pp.756-762. |
미소장 |
8 |
Park, J., Cha, Y., Jassmi, H.A., Han, S. and Hyun, C.T., 2020, Identification of Defect Generation Rules among Defects in Construction Projects Using Association Rule Mining, Sustainability, 12(9), 3875. |
미소장 |
9 |
Kamsu-Foguem, B., Rigal, F. and Mauget, F., 2013, Mining Association Rules for the Quality Improvement of the Production Process, Expert Systems with Applications, 40, pp.1034-1045. |
미소장 |
10 |
Bortolini, R. and Forcada, N. 2018, Building Inspection System for Evaluating the Technical Performance of Existing Buildings, Journal of Performance of Constructed Facilities, 32(5), 04018073. |
미소장 |
11 |
Lee, J., 2018, Value Engineering for Defect Prevention on Building Façade, Journal of Construction Engineering and Management, 144(8), 04018069. |
미소장 |
12 |
Agrawal, R., Imieliński, T. and Swami, A., 1993, Mining Association Rules between Sets of Items in Large Databases, In Acm Sigmod Record, 22(2), pp.207-216. |
미소장 |
13 |
University of Minnesota, 2016, Motivation and Means: How and why IPD and Lean Lead to success, Integrated Project Delivery Alliance, Lean Construction Institute. |
미소장 |
14 |
Song, Y. and Cho, J., 2016, The Analysis of Importance Change Order Factors in Space for Private Construction of Apartment Houses, Journal of the Architectural Institute of Korea Planning & Design, 32(2), pp.79-88. |
미소장 |
15 |
Kang, H., Lee, W., Kim, M. and Kim, Y., 2020, A Case Study on the Risk Impact and Loss Cost of Temporary Aircraft Runway Construction, Korean Journal of Construction Engineering and Management, 21(1), pp.32-39. |
미소장 |
16 |
Shmueli, G., Bruce, P.C. and Patel, N.R., 2016, Data Mining for Business Intelligence: Concepts, Techniques, and Applications with XLMINER, 3rd ed. Hoboken, NJ, Wiley, 509 p. |
미소장 |