Title page
Contents
1. Introduction 2
2. Trans Pennine Initiative Wireless Summary 2
3. Wireless Trial Options, Infrastructure, and Assumptions 3
4. Local Full Fibre Network 4
5. Call for Information Questions 4
6. Next Steps 5
7. General Instructions for Submission CfI Responses 5
8. Response Deadline 5
9. Format of Responses 6
10. Confidentiality & Freedom of Information 6
Appendix 1: Background to rail connectivity policy and relationship to Trans Pennine Initiative 6
Appendix 2: The Trans Pennine Express (TPE) route and the Passive Infrastructure planned to be built for the TPI Trial 7
Appendix 3: RIDC and the Passive Infrastructure to be built for the Testbed 8
Appendix 4: Additional Trial Questions 9