권호기사보기
| 기사명 | 저자명 | 페이지 | 원문 | 기사목차 |
|---|
결과 내 검색
동의어 포함
| 번호 | 참고문헌 | 국회도서관 소장유무 |
|---|---|---|
| 1 | Bruner, P.L., and OʼConnor, P.J. (2002). Bruner and OʼConnor on construction law, 2rd ed, West Group. | 미소장 |
| 2 | Jo, D.H. (2017). “Institutional Improvement Plans for Indirect Cost Issues Due to Public Works’ Prolonged Construction Period.” Chungang University A masteʼs thesis. | 미소장 |
| 3 | Jo, D.S. (2015). “Improvement Time Impact Analysis Method for Mega Construction Projects.” Hanyang University A masterʼs thesis. | 미소장 |
| 4 | Kim, B.S. (2012). “TACT Process Reengineering for Improving the Usability in Construction Sites.” Chungbuk University A masterʼs thesis. pp. 29-30. | 미소장 |
| 5 | Kim, D.G. (2017). “A Study on the Legal Issues Due to Time Extension of Public Construction Work.” Kwangwoon University A doctoral thesis. | 미소장 |
| 6 | Kim, S.G. (2013). Government Contract Law, 2rd ed, CNEWS. p. 317. | 미소장 |
| 7 | Lee, H.G. (2018). “A Risk Assessment Model for Delay Management Protocol in the Contract Conditions of International Construction Projects.” Ajou University A doctoral thesis. | 미소장 |
| 8 | ARCADIS. (2013). Annual Report, ARCADIS Research Report. | 미소장 |
| 9 | Ministry of Land, Infrastructure and Transport. (2014). A study on the indirect cost due to the extension of construction period, Research Report. | 미소장 |
*표시는 필수 입력사항입니다.
| 전화번호 |
|---|
| 기사명 | 저자명 | 페이지 | 원문 | 기사목차 |
|---|
| 번호 | 발행일자 | 권호명 | 제본정보 | 자료실 | 원문 | 신청 페이지 |
|---|
도서위치안내: 정기간행물실(524호) / 서가번호: 국내12
2021년 이전 정기간행물은 온라인 신청(원문 구축 자료는 원문 이용)
우편복사 목록담기를 완료하였습니다.
*표시는 필수 입력사항입니다.
저장 되었습니다.