I. Project outline 10

1. Project outline 10

2. Current status of project site 14

A. Current status of Lao PDR 15

3. Propulsion progress 17

A. Project discovering background 17

B. Feasibility study 17

C. PCP submission 17

D. Loan-Grant linked project promotion 17

E. Conclusion of a project agreement 18

F. Consultation with diplomatic missions abroad 18

II. Formative survey method 19

1. Outline of task implementation 19

A. Outline of survey 19

B. Scope of formative survey 20

C. Quality management plan 21

2. Research methods and survey design 22

A. Research methods 22

B. Survey design 26

C. Time line of the survey 27

D. Limitations 28

III. Result of research 30

1. Current status analysis 30

A. Coherence between policies and the project 30

B. Identification of the current status and demand of the target project region 38

C. Project validity aspect 69

D. Project execution aspect 71

E. Major elements of project aspects 72

2. Major Revision 75

A. Summary of revision compared to PCP and feasibility study report 75

B. Suggestions for consulting project plan before opening in 2024-2025 76

C. Details of the revision 76

3. Results of Baseline Survey 81

IV. Project Plan 84

1. Proejct Definition 84

A. Project name (Korean) 84

B. Impact & outcome 84

C. Project scope 85

2. Project Background 89

A. Sustainable Development Goals and Strategic Relevance of Partner Country 89

B. Relevance to Strategies of Korean government (consistent with CPS and government foreign policy) 90

C. Linkage to Mid- to long-term Strategic of KOFIH 90

3. Analysis of project implementing environment 92

A. Problem/demand analysis and solution 92

B. Analysis of lessons from past project 93

C. Analysis of project area 93

D. Stakeholder Analysis 94

4. Project execution system and performance method 97

A. Scheme of the project implementing system 97

B. Role and Responsibility 98

C. Communication Management 99

5. Project Design Matrix and Outputs 100

A. Project Design Matrix (PDM) 100

B. Output Summary 104

6. Budget and Schedule 105

A. Budget 105

B. Schedule 106

7. Monitoring and Evaluation Plan 107

A. Plan for the outcomes monitoring 107

B. Plan of the outcomes evaluation 107

8. Risk Management 110

V. Conclusion and Proposals 112

1. Conclusion of formative study 113

A. The necessity of securing healthcare professionals 113

B. Expansion and improvement of training courses for healthcare professional 113

2. Proposals for Future Projects 114

A. The Necessity of Second Project 114

B. The Need for a linkage with the Dr.LEE Jong-wook Fellowship program 115

Attachments[내용없음] 2

1. Results-based Management(RBM) Form (English)[내용없음] 2

2. Budget details[내용없음] 2

3. Meeting minutes[내용없음] 2

4. Reference[내용없음] 2

5. Materials submitted by PMU[내용없음] 2

6. List of tables[내용없음] 2

7. List of figures. Fin.[내용없음] 2