권호기사보기
| 기사명 | 저자명 | 페이지 | 원문 | 기사목차 |
|---|
결과 내 검색
동의어 포함
Title page 1
Contents 5
ABSTRACT 4
EXECUTIVE SUMMARY 8
ABBREVIATIONS AND ACRONYMS 9
NOMENCLATURE 10
Subscripts 10
Superscripts 10
1. TEST DESCRIPTION 11
1.1. Experiment Layout 11
1.2. Initial and Boundary Conditions 12
1.3. List of Events 12
1.4. Test Results 12
2. RELAP5 INPUT MODEL 13
2.1. Injection Line 13
2.2. Pipe Model 14
2.2.1. Standpipe Region 14
2.2.2. Extra Gas Volume 15
2.2.3. Henry's Law Injection 15
2.3. Accum Model 16
3. RESULTS 17
3.1. Assessment of Run «2024-09-27-Pipe» 18
3.2. Comparison of Different Runs 21
4. CONCLUSIONS 23
5. REFERENCES 24
APPENDIX A. HENRY'S LAW 25
APPENDIX B. TEST RESULTS 26
APPENDIX C. RELAP5 NWITHAIR FIX 30
APPENDIX D. CALCULATION RESULTS - DATA 31
APPENDIX E. CALCULATION RESULTS - FIGURES 104
Figure 1-1. Hydroaccumulator Vessel [1] 11
Figure 1-2. Injection Line Until Orifice [1] 11
Figure 2-1. Injection Line Model 13
Figure 2-2. Pipe Model Nodalization 14
Figure 2-3. Accum Model Nodalization 16
Figure 3-1. Immediate Start After Pressurization for «2024-09-27-Pipe» 18
Figure 3-2. Delayed Start After Pressurization for «2024-09-27-Pipe» 19
Figure 3-3. Comparison of Cases for Run «2024-09-27-Pipe», Test #51 20
Figure 3-4. Comparing the Base Case Across Different Runs, Test #51 21
*표시는 필수 입력사항입니다.
| 전화번호 |
|---|
| 기사명 | 저자명 | 페이지 | 원문 | 기사목차 |
|---|
| 번호 | 발행일자 | 권호명 | 제본정보 | 자료실 | 원문 | 신청 페이지 |
|---|
도서위치안내: / 서가번호:
우편복사 목록담기를 완료하였습니다.
*표시는 필수 입력사항입니다.
저장 되었습니다.