권호기사보기
| 기사명 | 저자명 | 페이지 | 원문 | 기사목차 |
|---|
결과 내 검색
동의어 포함
Title page 1
Contents 9
ABSTRACT 5
FOREWORD 7
PREFACE 8
ABBREVIATIONS AND ACRONYMS 13
1. INTRODUCTION 16
1.1. Background 16
1.2. Radiation Exposure Information on the Internet 17
2. LIMITATIONS OF THE DATA 19
2.1. Limitations 19
2.2. Statistical Comparisons 20
3. ANNUAL PERSONNEL MONITORING REPORTS-10 CFR 20.2206 22
3.1. Definition of Terms and Methodologies 22
3.1.1. Number of Licensees Reporting 22
3.1.2. Number of Monitored Individuals 22
3.1.3. Number of Individuals with Measurable Dose 22
3.1.4. Collective Dose 24
3.1.5. Average Individual Dose 24
3.1.6. Average Measurable Dose 24
3.2. Annual TEDE Dose Distributions 24
3.3. Summary of Occupational Dose Data by Licensee Category 26
3.3.1. Industrial Radiography Licensees-Fixed Location and Temporary Job Sites 26
3.3.2. Manufacturing and Distribution Licensees-Type "A" Broad, Type "B" Broad, Other, and Nuclear Pharmacies 27
3.3.3. Low-Level Waste Disposal Licensees 29
3.3.4. Independent Spent Fuel Storage Installation Licensees 29
3.3.5. Fuel Cycle Licensees 30
3.3.6. Light-Water Reactor Licensees 33
3.3.7. Other Facilities Reporting to the NRC 33
3.4. Summary of Intake and Internal Dose Data by Licensee Category 33
4. COMMERCIAL POWER REACTORS 39
4.1. Introduction 39
4.2. Definition of Terms and Sources of Data 39
4.2.1. Number of Reactors 39
4.2.2. Electric Energy Generated 39
4.2.3. Collective Dose per Megawatt-Year 40
4.2.4. Average Maximum Dependable Capacity 40
4.2.5. Percent of Maximum Dependable Capacity Achieved 40
4.3. Annual TEDE Distributions 44
4.4. Average Annual TEDE Doses 47
4.5. Three-Year Average Collective TEDE per Reactor 53
4.6. International Occupational Radiation Exposure 58
4.7. Decommissioning of Commercial Nuclear Power Reactors 60
4.7.1. Decommissioning Process 60
4.7.2. Post-Shutdown Decommissioning Activities Report 60
4.7.3. License Termination Plan 60
4.7.4. Implementation of the License Termination Plan 61
4.7.5. Completion of Decommissioning 61
4.7.6. Status of Decommissioning Activities at Commercial Nuclear Power Reactors 63
5. TRANSIENT INDIVIDUALS AT NRC-LICENSED FACILITIES 65
6. EXPOSURES TO PERSONNEL IN EXCESS OF REGULATORY LIMITS 68
6.1. Reporting Categories 68
6.2. Summary of Occupational Radiation Doses in Excess of NRC Regulatory Limit 69
6.3. Summary of Annual Dose Distributions for Certain NRC Licensees 69
6.4. Maximum Occupational Radiation Doses Below NRC Regulatory Limits 70
7. REFERENCES 72
APPENDIX A. ANNUAL TOTAL EFFECTIVE DOSE EQUIVALENT FOR NONREACTOR NRC LICENSEES AND OTHER FACILITIES REPORTING TO THE NRC 2022 74
APPENDIX B. ANNUAL DOSES AT LICENSED NUCLEAR POWER FACILITIES 2022 80
APPENDIX C. PERSONNEL, DOSE, AND POWER GENERATION SUMMARY 1969-2022 84
APPENDIX D. DOSE PERFORMANCE TRENDS BY REACTOR SITE 1973-2022 139
APPENDIX E. PLANTS NO LONGER IN OPERATION 2022 195
APPENDIX F. GLOSSARY 2022 214
Figure 3-1. Individuals with Measurable TEDE, Collective TEDE, and Average Measurable TEDE for Industrial Radiography Licensees 1994-2022 27
Figure 3-2. Individuals with Measurable TEDE, Collective TEDE, and Average Measurable TEDE for Manufacturing and Distribution Licensees 1994-2022 29
Figure 3-3. Individuals with Measurable TEDE, Collective TEDE, and Average Measurable TEDE for Independent Spent Fuel Storage Installation... 30
Figure 3-4. Annual Exposure Information for Fuel Cycle Licensees 1994-2022 32
Figure 4-1. Average Collective Dose per Reactor and Average Number of Individuals with Measurable Dose per Reactor 1994-2022 48
Figure 4-2. Number of Operating Reactors and Electricity Generated 1994-2022 49
Figure 4-3. Average Measurable Dose per Individual and Collective Dose per Megawatt-Year 1994-2022 50
Figure 4-4a. Average, Median, and Extreme Values of the Collective Dose per BWR Reactor 1994-2022 51
Figure 4-4b. Average, Median, and Extreme Values of the Collective Dose per PWR Reactor 1994-2022 52
Figure 4-5. Average Collective Dose per PWR Reactor 1995-2022 59
Figure 4-6. Average Collective Dose per BWR Reactor 1995-2022 59
Figure 4-7. Commercial Nuclear Power Reactor Decommissioning Process Flowchart 62
*표시는 필수 입력사항입니다.
| 전화번호 |
|---|
| 기사명 | 저자명 | 페이지 | 원문 | 기사목차 |
|---|
| 번호 | 발행일자 | 권호명 | 제본정보 | 자료실 | 원문 | 신청 페이지 |
|---|
도서위치안내: / 서가번호:
우편복사 목록담기를 완료하였습니다.
*표시는 필수 입력사항입니다.
저장 되었습니다.