Contents 1

INTRODUCTION 1

WHAT IS A DATA CENTER? 4

WHAT AI WORKLOADS MEAN FOR DATA CENTERS 5

CONCERN 1: AI WORKLOADS USE TOO MUCH ELECTRICITY 9

CONCERN 2: AI WORKLOADS CROWD OUT OTHER USES OF LIMITED GRID CAPACITY 11

CONCERN 3: AI WORKLOADS WILL RAISE HOUSEHOLD ELECTRICITY BILLS 16

CONCERN 4: AI WORKLOADS THREATEN GRID RELIABILITY 20

CONCERN 5: AI WORKLOADS STRAIN LOCAL WATER RESOURCES 24

CONCLUSION 34

REFERENCES 35

Figures 4

Figure 1. Common infrastructure and equipment at a typical data center 4

Figure 2. DGX H100 System topology 7

Figure 3. Vertical stacking of HBM next to a GPU 8

Figure 4. Increase in global electricity demand by sector, 2024-2030 9

Figure 5. RTOs and ISOs in the United States 12

Figure 6. Time-series plot of power draw from an AI workload 21

Figure 7. Chip temperature fluctuations of Google's TPU chips 27

Figure 8. Heat buildup in 3D-stacked memory 28