Contents 1
INTRODUCTION 1
WHAT IS A DATA CENTER? 4
WHAT AI WORKLOADS MEAN FOR DATA CENTERS 5
CONCERN 1: AI WORKLOADS USE TOO MUCH ELECTRICITY 9
CONCERN 2: AI WORKLOADS CROWD OUT OTHER USES OF LIMITED GRID CAPACITY 11
CONCERN 3: AI WORKLOADS WILL RAISE HOUSEHOLD ELECTRICITY BILLS 16
CONCERN 4: AI WORKLOADS THREATEN GRID RELIABILITY 20
CONCERN 5: AI WORKLOADS STRAIN LOCAL WATER RESOURCES 24
CONCLUSION 34
REFERENCES 35
Figures 4Figure 1. Common infrastructure and equipment at a typical data center 4
Figure 2. DGX H100 System topology 7
Figure 3. Vertical stacking of HBM next to a GPU 8
Figure 4. Increase in global electricity demand by sector, 2024-2030 9
Figure 5. RTOs and ISOs in the United States 12
Figure 6. Time-series plot of power draw from an AI workload 21
Figure 7. Chip temperature fluctuations of Google's TPU chips 27
Figure 8. Heat buildup in 3D-stacked memory 28